The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations to renew the AP1000 design certification and incorporate Revision 20 of the AP1000 design control document. The purpose of this rulemaking action is to update the AP1000 design to be consistent with changes made to the design during the licensing, construction, and operation of Vogtle Electric Generating Plant, Units 3 and 4. This rulemaking incorporates AP1000 design control document Revision 20, which includes updates made to the AP1000 design to represent a current, construction-validated design. The NRC is also issuing an environmental assessment supporting this rule.
Published October 14, 2026Document 2026-21030Effective December 28, 2026
Comments are due November 13, 2026. Submit through the link above or follow the instructions in the document's ADDRESSES section. Say who you are, how the rule affects you, and what should change, with evidence. Comments are usually public, so leave out anything private.